Horizontal Sponge Continuous Foaming Producing Line / Flexible Foam Making Machine - QFP-2017

Horizontal Sponge Continuous Foaming Producing Line / Flexible Foam Making Machine For Sale, Most Competitive Price, Fast Delivery, Custom Service, Wholesale Horizontal Sponge Continuous Foaming Producing Line / Flexible Foam Making Machine, Made in China, High Quality Products!, China cheap prodocuts, china suppliers Supplier, Manufacturer.
Horizontal Sponge Continuous Foaming Producing Line / Flexible Foam Making Machine

Continuous automatic Memory Funiture sponge with Siemens motor foaming production line

Product Description

?

The device is suitable for the production of hard/soft polyurethane foam with 6-100 KG/M3 density , which is used in the fields of furniture,bra,shoes,electronice,packaging,clothing,aviation,transportation,industrial and civil building heat preservation and energy-saving.The production line has automatic computer to control,PLC operating system with high degree of automation and low production costs,it is the ideal equipment for large enterprises.

?

[Specifications]

- - - -
Dimension | L33M×W4M×H3M |
Foaming width | 980mm~2250mm |
Foaming height | Under 1200mm |
Foaming density | 8kg/m3~100kg/m3 |
Foaming speed | 2000rpm~7000rpm |
- - - -

?

(1) The whole machine parts specifications:

1. Foaming control Platform(standard) L3m×W2.52m×H0.7m

2. Oven declining board (standard) L9m×W0.98m~2.30m

3. Oven side links(standard) L18m×W2.3m×H1.2m

4. Oven machine frame(standard) L18m ×W4m×H3m

5. Oven inner conveyer line (standard) L18m×W2.3m×H0.83m

6. Foam block cutter machine (standard) W2.3m×H1.30m(saw/knife with cross type )

?

(2) Main technique specification

1. Total length 33m× width 4m×height 3m

2. Foaming material Group: 13 groups, man-machine interface, automatically computer control

3. Foaming width 980mm~2250mm

4. Foaming height Max 1300mm

5. Foaming density 8Kg/m3~100Kg/m3

6. Foaming speed 2000r/min~7000r/min

7. Max total output 300KG/min

?

- - - -
Motor | Guangdong brand |
Pump | Viking pump & Chinese pump |
Invertor | Siemens brand |
PLC | Siemens |
Temperature | Control system |
- - - -

?

Remark:The above only for reference. All the data is subjected to sold products.

?

?

The frame of production line



?

The foam oven



?

Foaming control platform



?

Mixing head and material tanks





?

Packing & shiping

?

How is the packing of the machine?

The entire machine will be nude packing. Some of the parts will be pack in wooden case. Others will be simple pack with paper or foam sheet with plastic film.

?

How many container will be needed for the whole set of machine?

Total three containers is enough 2*40HQ+1*20GP. In order to save the place and the cost of delivery we will also put some parts that inside the raw material tank.

?

We will try the best way to pack all the machine well and also save the freight cost.

?



?

Our Services

?

We will help to design the layout of the machine that put in your factory.

We will send 2-4 experience engineers to install and testing the machines.

We will teach your engineer how to operate the machine and how to maintain the machines.

We will give you the machine operation manual and the best formulation for target products that you are going to make.



?

FAQ

?

Q: How many days for the install and testing of the machine?

A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.

?

Q: For the cost of the engineer how much I need to pay?

A: You need to pay USD50 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.

?

Q:What kind of raw material tools we need to prepare for the testing?

A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.

?

Q: After the machine testing if we need some engineer to stay in our factory can you help to find?

A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.

?

Q:During the foaming if we have some problems abt the foam and the machine how can we do?

A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.

?



?

You are warmly welcome come and visit our factory.

Get Quote

Dongguan Qianghui Foaming Machinery Technology Co., Ltd.

Address: BaoAnWei No.1 Village,Gaobu Town, Dongguan, Guangdong, China, 511700
Tel: 86-769-81302245
Dongguan Qianghui Foaming Machinery Technology Co.,Ltd聽is professional mechanical Sponge machinery, Foam machine equipment, advanced equipment and strong technical force, brought together for many years sponge machine, foam machinery and Foam machine of valuable experience, learning from intern

Related Products

Send A Message
*If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.