High Grossy Treatment Plastic Injection Mould Parts For Washing Machine Body Cap - AKAI6003

High Grossy Treatment Plastic Injection Mould Parts For Washing Machine Body Cap For Sale, Most Competitive Price, Fast Delivery, Custom Service, Wholesale High Grossy Treatment Plastic Injection Mould Parts For Washing Machine Body Cap, Made in China, High Quality Products!, China cheap prodocuts, china suppliers Supplier, Manufacturer.
High Grossy Treatment Plastic Injection Mould Parts For Washing Machine Body Cap

Plastic Injection Mould for Washing Machine Body Cap with PP

?

?

Product Details

?

1. Runner : Hot Runner

?

2. Hot Runner Supplier: YUDO

?

3. Product Weight: 430g

?

4. Injection Machine: 650T

?

5. Core Lift Quantity : 1

?

6. Core Slider: 1

?

7. Thickness: 3mm

?

8. Product Size: 800*750*180mm

?

9. Lead Time: 30 Days (T0)

?

10. Cavity Material: 718H

?

11. Core Material: 718H

?

12. Product Application: Body Cap of Washing Machine

?

?

Mold Processing Description

?

1. Purchasing Material : According to Material List

?

A: Mould Base ( LKM Standard)

?

B: Ejector Pins

?

C: Sleeve Pins

?

D: Rectangular Ejector Pins

?

F: Puller Bolt

?

G: Purchasing Material of Cavity, Core, Insert , Slider, Ejector Rod.

?

?

2. Program of CNC

?

3. CNC Milling

?

4. EDM

?

5. Wire Cutting

?

6. Fitting Mould

?

PL, Sprue Bushing, Gate Bushing, Runner Lock Pin, Locating Ring, Angular Pin, Slide Locks etc.

?

7. Mold Trial.

?

8. Dimension Checking

?

9. Mould Confirmation

?

10. Delivery.

?

?

Process:

?

- - - -
? Samples / Drawing ? | ? We need your detailed requirement clearly. ? |
? Negotiation ? | ? Material, Cavity, Price, Payment terms, Delivery time etc ? |
? Place order ? | ? According to your own design or we can design for you ? |
? ?Mould design ? | ? We will communicate & exchange the opinion with you during making drawing ? |
? Tooling mould ? | ? After customers& acute; confirmation, we will start making mould ? |
? Mould process ? | ? Providing photos tp customer to show tooling process ? |
? Sample confirmatin ? | ? Send you sample for confirmation, if not satisfied, we will modify the mould ? |
? ?Shippment ? | ? After confirm the sample, then arrange the shippment ? |
- - - -

?

?

How to make your OEM plastic injection mould:

?

1. Analysis report before OEM plastic injection mould making

?

Parting Line, EP Line, ?Insert Line, Gate Position, Slider Line etc.

?

If necessary, we can send you analysis report for you learn mould design information before mould making.

?

?

2. Design 3D and 2D Mould Drawing

?

Our Engineer will design 3D and 2D mould drawing for your confirmation.

?

Design Software: Pro-E, Iges, UG, CAD etc

?

Mould Base Material: LKM, HASKCO, LOCAL, DME etc

?

Mould Core Material: 718H, S136H, NAK80, P20 ect

?

Mould Cavity: Single & Multi Cavity

?

Runner: Cold or Hot Runner

?

Gate: Pinpoint Gate or Edge Gate

?

Finish: Polish or Texture.

?

3. Manufacturing Mould

?

Main Processing Equipment: CNC Machines, Milling Machines, Grinding Machine, EDM etc.

20-30 days for mould making and first sampples.

?

4. Trail Mould

?

5. Test Mould

?



?

6. ?Mass production after confirmation

?

Material Reception, Incoming Quality Check(IQC) Records, Production Quality Check(PQC) records and Final Inspection(FI) records are availiable.

?

There are work instructions for workers to follow it to perform their work and regular QC Inspections on products during manufacturing.

?

There is approval samples attached to working stations and production lines for reference where appropriate.

Non-conforming products properly segregated and clearly identified.

?

7-20 days for mass production.

?

7. Second Processing: Silk-Screen Printing, Painting, Ultrasound, Assembly and so on.

?

8. Package and Shipment

?

Wooden case for Plastic Injection Mould

?

Inner package for plastic injection products: 1pcs/polybag. Carton box for out package. If necessary, cartons would be place to pallets.

?

Our factory is near to Yantian&Shekou port, Baoan Airport and Hongkong. It takes 40 minutes go to Yantian&Shekou port and Baoan Aiport. It takes about one and half an hour go to Hongkong. It is convenient for tranportation.

?

?



?

?

Get Quote

Dongguan Yaxing plastic mould factory

Address: Room 705 706, Opulent Building, 402 406 Hennessy Road, Dongguan, Guangdong, China, 511700
Tel: 86-769-85338418
聽 Yaxing Plastic Mould Factory, founded in 2000 with an area of 5000 square meter,聽We are speicalized in High quality injection mold, Two-shot molds,Double injection moulds, die casting etc as well as BMC mold, MUD mold of DME standard and quick change system mold of HASCO standard.In a

Related Products

Send A Message
*If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.