Continuous Polystyrene Sponge Foam Manufacturing Equipment For Mattress / Pillow - QHF-2017

Continuous Polystyrene Sponge Foam Manufacturing Equipment For Mattress / Pillow For Sale, Most Competitive Price, Fast Delivery, Custom Service, Wholesale Continuous Polystyrene Sponge Foam Manufacturing Equipment For Mattress / Pillow, Made in China, High Quality Products!, China cheap prodocuts, china suppliers Supplier, Manufacturer.
Continuous Polystyrene Sponge Foam Manufacturing Equipment For Mattress / Pillow

Continuous Polystyrene Sponge Foam Manufacturing Equipment For Mattress / Pillow

?

Specification


This machine is mostly used to produce large-scale continuously foaming production (density is about 6 to 100 kg/m3 ) . It adopts the advanced touch screen and PLC Operation System , its automatization level is high , the production is low-cost and the quality fo foam is outstanding .
It is the most ideal equipment for large-scale foaming produce . Man-machine interface , non-stop the machine can change formulas , it can produce the British elevation high-slow rebound , electronic cotton , brassieres cotton , polyester cotton , yellow-resistant up to 3-5 level , add powder 10 to 200 parts , the lowset density 6-100 , it also can produce on machine .

?

?

Main specification

?

- - - -
?Oven Length | 18m |
?Foam Height | 1.0-1.25m |
?Foam Width | 1.0-2.25m |
?foam desity | 8-200kg/m3 |
?total power | 130KW |
?inner coveyer length | 18m |
?side board adjustable width | 0.98-2.3m |
?conveyer belt speed | 0-8m/min |
?fall plate | seven section adjustable |
?total output | 100-300kg/min |
?machine dimension | L35× W4.2 ×H3.2m |
- - - -
? ?
Main technique specification:

?

- - - -
Dimension | Total length 35m×Total width 4m×Total Height 3m |
Foaming material Group | 13 groups, man-machine interface, both manual and automatically computer control |
Foaming width | 980mm~2250mm |
Foaming height | Max 1200mm |
Foaming density | 8Kg/m3~100kg/m3 |
Foaming speed | 2000r/min~7000r/min |
Max total output | 300kg/min |
Material spraying way | ① The way of down sprayer head (upper, down, front, back can be adjusted) ? ? ? ? ? ? ② the way of trough overflow pipe. |
Controlling way of foaming | ①PLC controlling, can continuously foaming two different formulas in one time ②All inverter controlling foaming and work in phase with the production line ③Oven declining board height and width can be adjusted by control box. ④Oven side links width can be adjusted by control box |
Mixing –head motor | 37kw |
Total power | About 90kw |
- - - -
? ?
How is the packing of the machine?

?

The entire machine will be nude packing. Some of the parts will be pack in wooden case. Others will be simple pack with paper or foam sheet with plastic film.

?

How many container will be needed for the whole set of machine?

?

For the standard 13 groups of?Automatic continous foam machine Total three containers is enough 2*40HQ+1*20GP. In order to save the place and the cost of delivery we will also put some parts that inside the raw material tank.

We will try the best way to pack all the machine well and also save the freight cost.

?

?
Our Services
?

1.We will help to design the layout of the machine that put in your factory.

?

2.We will send 2-4 experience engineers to install and testing the machines.

?

3.We will teach your engineer how to operate the machine and how to maintain the machines.

?

4.We will give you the machine operation manual and the best formulation for target products that you are going to make.

?

5.We will help to buy the best raw material for making the foam if you needed.

?

?

FAQ:

?

Q: How many days for the install and testing of the machine?

?

A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.

?

Q: For the cost of the engineer how much I need to pay?

?

A: You need to pay USD40 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.

?

Q:What kind of raw material tools we need to prepare for the testing?

?

A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.

?

Q: After the machine testing if we need some engineer to stay in our factory can you help to find?

?

A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.

?

Q:During the foaming if we have some problems abt the foam and the machine how can we do ?

?

A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.

?

Q: During the using of the products if we find some problem how can we slove?

?

A: You can just help to check in the operation manual and the video first if can’t work just call our after sale service.

?

Q: How many spare parts for you to give us?

?

A: We will send you all the necessary spare parts that free of charge together with the machine. After that you need to buy.

?

?

?

The main part of the machine

?



?

?

?

Get Quote

Dongguan Qianghui Foaming Machinery Technology Co., Ltd.

Address: BaoAnWei No.1 Village,Gaobu Town, Dongguan, Guangdong, China, 511700
Tel: 86-769-81302245
Dongguan Qianghui Foaming Machinery Technology Co.,Ltd聽is professional mechanical Sponge machinery, Foam machine equipment, advanced equipment and strong technical force, brought together for many years sponge machine, foam machinery and Foam machine of valuable experience, learning from intern

Related Products

Send A Message
*If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.